Sunday, October 16, 2011

demolition stage 1

BEFORE

AFTER
after much anticipation, work will be starting very, very soon on our new bach bathroom. Yesterday Mr B and Sydney, his off-sider, knocked down the awful back porch covered in artificial grass and a makeshift outside shower. That's stage 1 complete! Well done guys.

For Stage 2 they'll demolish and remove what's left of the addition so that a new lean-to can be built in it's place to house the new bathroom/laundry. There's a fair bit of drainage work to take place to connect us to the main sewage system. At the same time, we're having the roof replaced and the deck steps tidied up. All very exciting stuff!

No comments: